Axle joints which were covered with surface rust were thoroughly cleaned, bead blasted and then painted. Both bearings in the uprights will need replacement. The tie-downs were able to squeeze the chassis together to make it as straight as possible. Today the new aluminum floor will be cut from the old steel floor template.
No comments:
Post a Comment