Sunday, October 6, 2013

Steering, Instrument Panel and Suspension Completed


Both fron and rear suspensions have been completed as well as gear selector and steering. New aircraft hardware has arrived which will replace many of the missing nuts and bolts. Next step will be pedal assembly , brakes and clutch. Once this is done everthing will be dissasembled again and catalogued in order to strip and paint the frame. At that point we will do any chassis modifications such as stiffening the lower tub by riveting in a stronger floor and moving the fuel cel from the side pods to a safer location which is behind the driver.








No comments:

Post a Comment